Shiyan Yilianda that has been established for over 16 years and is now a leading suppliers in China specializing in kinds of engine and engine parts. Especially in engine, cylinder head, turbocharger, fuel injection pump, oxygen sensor, urea dosing pump, crankshaft, piston ect
Our products are widely used for bus, truck, bulldozer, excavator, generator, tractor, marine engine, construction machinery. Especially for
A23000,B3.3,4BT3.3,6BT5.9,6CT8.3,L8.9,L10,M11,NT855,K19,K38,K50,ISF,ISBE,ISDE,ISCE,ISLE,ISM11,ISX15,QSB3.3,QSB5.9,QSB6.7,QSC8.3,QSL9,QSM11,QSX15.
Camshaft 3608786 for CCEC Cummins Engine NTA855 N14
1.Durable and high Quality.
2.Nice-looking packing.
3.Prompt delivery.
4.Wide range of parts for more models available.
5.Most competitive wholesale prices.
6.One stop buying service provided.
Part Name |
Camshaft |
Part Number |
3608786 |
Engine Type |
for CCEC Cummins Engine NTA855 N14 |
Brand |
Cummins Genuine / OEM |
Packing |
Original / Neutral / Customized |
Production |
1000PCS Per Month |
MOQ |
1 Piece |
Payment Term |
T/T, Western Union, Paypal, L/C, etc. |
Question 1:How to buy engine spare parts? First of all, please tell us the part number of the parts you need. We will supply the same parts as yours. Secondly, if you don't know the part number, please provide parts name and engine series number, then we will check the part number through engine series number.
Question 2:How long is the delivery time? For complete engine and Power units , we need to arrange production according to the order, our general delivery time is 15-30 days. For spare parts , our general delivery time is 3-10 days.
Question 3:How to arrange delivery? Considering the large volume and weight of our products, to save the shipping cost, we generally recommend ship to your nearest port For small items and urgent orders, we can also provide air shipment and send goods to the airport in your city or your company address.
Question 4:How about Payment Methods? We suggest 30/70,T/T payment method: 30 percent down payment on placement of the order, with the remaining 70% due upon shipment.
Question 5:How about Packing Methods? Normally we use wooden boxes for packaging or we can pack it according to your special needs.