What products we can supply to customers :
1) Diesel Engine complete for 4BT, 6BT, 4CT, 6CT, 6LT, QSB4.5, QSB6.7, QSB5.9, ISF2.8, ISF3.8, QSL9, QSM11, QSX15, ISM11, ISG11, ISG12, QSB7, QSL8.9, QSL9.3, QSF2.8, QSF3.8, ISB series, ISDe series, ISLe series, etc.
2) Cylinder head, cylinder head assembly, cylinder block, crankshaft
3) Engine long block / bare engine, engine short block
4) Full series of engine spare parts for some models: such as Cummins 4BT/6BT ISF2.8, ISF3.8, GW4D20, GW4G15, GW2.8, etc.
Advantage :
1) Focused on diesel engine field with more than 8 years, with rich experience.
2) About the supply full series engines for cummins and engine parts, includs B, C, K, L, M, Q, N, K series, etc.
3) Affirmed value of money for customers: ensure all the diesel engines with no defect and has a high quality by professional technology and strick quality test before delivery.
4) Fast delivery: most model of engines always keep a reasonable stock quantity, able to make delivery in a short time after order is confirmed.
5) Profesional service: according to different application and fitment, we able to adjust the engine by different original spare parts, and also able to adjust the diesel engine's horse power according to customer's requirement and application.
Part Name |
Engine assembly |
Rate power/speed |
180HP@2200RPM |
Engine Model |
ISM 11 |
Max torque/speed |
770N.m/ 1500rpm |
Packing |
Original / Neutral / Customized |
Warranty |
6 Months |
MOQ |
1 Piece |
Payment Term |
T/T, Western Union, Paypal, L/C, etc. |
Delivery way |
DHL/FEDEX/UPS/TNT,By Air, By Sea |
FOB Port |
Shanghai, Wuhan, Ningbo,Guangzhou,Shenzhen etc |
Question 1:How to buy engine spare parts? First of all, please tell us the part number of the parts you need. We will supply the same parts as yours. Secondly, if you don't know the part number, please provide parts name and engine series number, then we will check the part number through engine series number.
Question 2:How long is the delivery time? For complete engine and Power units , we need to arrange production according to the order, our general delivery time is 15-30 days. For spare parts , our general delivery time is 3-10 days.
Question 3:How to arrange delivery? Considering the large volume and weight of our products, to save the shipping cost, we generally recommend ship to your nearest port For small items and urgent orders, we can also provide air shipment and send goods to the airport in your city or your company address.
Question 4:How about Payment Methods? We suggest 30/70,T/T payment method: 30 percent down payment on placement of the order, with the remaining 70% due upon shipment. Question 5:How about Packing Methods? Normally we use wooden boxes for packaging or we can pack it according to your special needs.